# What does your release testing look like?

**URL:** <https://club.ministryoftesting.com/t/what-does-your-release-testing-look-like/85613>\
**Category:** Discussions\
**Tags:** learning, process\
**Created:** [1 July 2025 06:27 UTC](https://club.ministryoftesting.com/t/what-does-your-release-testing-look-like/85613 "2025-07-01T06:27:52Z")\
**Posts on this page:** 7\
**Page:** 1

<div class="post-metadata">

**Author:** ![chunkyy](https://avatars.discourse-cdn.com/v4/letter/c/d78d45/32.png) [@chunkyy](https://club.ministryoftesting.com/u/chunkyy)\
**Post date:** [1 July 2025 06:27 UTC](https://club.ministryoftesting.com/t/what-does-your-release-testing-look-like/85613/1 "2025-07-01T06:27:52Z")

</div>

What does your release testing look like?

I’m looking to understand what ‘Release Testing’ looks like for you:

- Is it a ‘big’ team event?
- How long does it take?  
– Is it limited?
- What are you testing?  
– Stories that were implemented?  
– Critical workflows
- How often does it happen?
- Is it a distraction to ongoing work?
- How do you measure success?

We have a couple of processes that are similar and different in their own ways, it is a mixture of automation and manual/exploratory testing. We look to time box this to a 2 hour window allowing enough time to run the automation suite and look through any possible issues whilst carrying out manual testing on high value features that currently cannot be automated.

The focus is on regression and critical workflow with some exploratory, trying to avoid a complete retest of the new features that have been added.

Thanks

---

<div class="post-metadata">

**Author:** ![leetestsmurray](https://sea2.discourse-cdn.com/flex020/user_avatar/club.ministryoftesting.com/leetestsmurray/32/14736_2.png) [@leetestsmurray](https://club.ministryoftesting.com/u/leetestsmurray)\
**Post date:** [1 July 2025 09:18 UTC](https://club.ministryoftesting.com/t/what-does-your-release-testing-look-like/85613/2 "2025-07-01T09:18:14Z")

</div>

At a previous employer we had release testing which consisted of the critical workflows and new features that either will not or have not been automated yet.

**Is it a ‘big’ team event?** - We had a very large system and tight window to complete, so the only way we could get it done was with a whole team effort. However as time went on and this become more automated we got it down to one FTE for the day + automation.

**How long does it take?** - We had a week (5 days) to complete testing and investigate issues (Like I said large system).

**What are you testing?** - We did both testing of new features and Critical workflows, on occasion there would be something else thrown into the mix depending on the release requirements.

**How often does it happen?** - Every release. We also had smoke tests for minor maintenance updates or hotfixes.

**Is it a distraction to ongoing work?** - It can be but I found giving plenty of notice and making the whole feature team aware it was not generally an issue. Release took higher priority than WIP. We also took the saying its a team effort seriously and if the teams tester is on release testing the devs would execute the testing with the tester reviewing after release testing is complete.

**How do you measure success?** - Every company is slightly different but we had a set of entry and exit criteria, a breach in any of these would result in a NOGO decision for the release. This consisted of things like \>95% pass rate, 0 high priority issues, etc. You would need to work out what success looks like for you.

---

<div class="post-metadata">

**Author:** ![oxygenaddict](https://sea2.discourse-cdn.com/flex020/user_avatar/club.ministryoftesting.com/oxygenaddict/32/15064_2.png) [@oxygenaddict](https://club.ministryoftesting.com/u/oxygenaddict)\
**Post date:** [8 July 2025 18:40 UTC](https://club.ministryoftesting.com/t/what-does-your-release-testing-look-like/85613/3 "2025-07-08T18:40:58Z")

</div>

I just died a little inside as I despise our release testing process. In fact despite is probably too gentle of a term.

My work, in theory, has releases ever 3 months. For each release we have a period known as hardening, which effectively release testing. There’s a team that run the same few hundred test cases every single release for every feature released prior to I think 2023 (Sigh). Development teams are then responsible for testing all features added after then. Some teams will do lots of testing. We do enough to ensure our previous features aren’t borked by another team and that our features that we’ve heavily tested still exist. The whole process tends to take anything from 6 to 18 weeks.

It’s a pain in the backside and a distraction for 3 of us (out of ~25 folk) in my group of teams. We only spend about 2-3 days per release cycle but there’s so many bugs across the wider org that whilst we’ll test Release Candidate 1, it’s usually a few more RCs later before we can release. Amazingly we can have two of these release cycles on the go at once, so bad are we at delivering with quality.

In terms of assessing the value. Well if you’re finding showstopper issues it’s worthwhile.

Side note: our industry is “different”… Customers don’t want frequent releases.

P.s. I really hope no one from my work reads this 😂

---

<div class="post-metadata">

**Author:** ![oxygenaddict](https://sea2.discourse-cdn.com/flex020/user_avatar/club.ministryoftesting.com/oxygenaddict/32/15064_2.png) [@oxygenaddict](https://club.ministryoftesting.com/u/oxygenaddict)\
**Post date:** [8 July 2025 18:47 UTC](https://club.ministryoftesting.com/t/what-does-your-release-testing-look-like/85613/4 "2025-07-08T18:47:12Z")

</div>

As a better example, my previous company before we were bought over would have a 4 month release cadence (same industry) but we’d be slightly more “all hands on deck”. A team of 4 would get everything done within a few days. This took some getting to as we kept refining and cutting the fat from our release testing. I was quite proud of cutting our testing from 2-3 weeks for 6+ folk to a smaller team for a couple of days.

Basically our goal and success was measured by proving there were no showstoppers. Validated by lack of escalations.

---

<div class="post-metadata">

**Author:** ![ansha\_batra](https://sea2.discourse-cdn.com/flex020/user_avatar/club.ministryoftesting.com/ansha_batra/32/12845_2.png) [@ansha\_batra](https://club.ministryoftesting.com/u/ansha_batra)\
**Post date:** [10 July 2025 06:08 UTC](https://club.ministryoftesting.com/t/what-does-your-release-testing-look-like/85613/5 "2025-07-10T06:08:47Z")

</div>

We usually time-box it to about 1.5–2 hours. It’s not meant to block the whole team, but enough time to:  
Manually check the critical workflows - login, payments, dashboards, etc.  
Do a bit of targeted exploratory testing especially on areas that recently changed or can’t be automated.

We don’t try to retest every new feature again that’s mostly handled earlier. The focus here is: “Is everything still working together?” More of a final “sanity + confidence” check than a deep dive.

It’s not a big team event, but anyone can jump in. Usually just the QA, dev involved in the change, and sometimes PM if they want to give it a last look.

We do this for every release, and try to keep it lightweight so it doesn’t feel like a drag.

---

<div class="post-metadata">

**Author:** ![ghawkes](https://sea2.discourse-cdn.com/flex020/user_avatar/club.ministryoftesting.com/ghawkes/32/10000_2.png) [@ghawkes](https://club.ministryoftesting.com/u/ghawkes)\
**Post date:** [10 July 2025 07:07 UTC](https://club.ministryoftesting.com/t/what-does-your-release-testing-look-like/85613/6 "2025-07-10T07:07:40Z")

</div>

We’re on that same journey. All our products have some link so the biggest test problem is validating there is no knock effect to changes. We were also in the 2-3 weeks bracket and have managed to get most products down to a week with a smaller team. However, one product at the beginning of our data flow is proving more of challenge 😬

---

<div class="post-metadata">

**Author:** ![aimantirmizi](https://sea2.discourse-cdn.com/flex020/user_avatar/club.ministryoftesting.com/aimantirmizi/32/15210_2.png) [@aimantirmizi](https://club.ministryoftesting.com/u/aimantirmizi)\
**Post date:** [10 July 2025 09:13 UTC](https://club.ministryoftesting.com/t/what-does-your-release-testing-look-like/85613/7 "2025-07-10T09:13:06Z")

</div>

Bit of a context: At my current role: I have managed to established a “ **Quality Roadmap** ” which clearly stats **what** needs to be done, **who** will be doing it and **when** it needs to be done in Dev env, in Staging and in Production environment once the release is deployed.

> [@chunkyy](#):
>
> **Is it a ‘big’ team event?**  
> No. We have a dedicated team on Production side. Including me. Timeboxed fashion.
> 
> **How long does it take?**  
> – Is it limited?  
> Its limited to 1-2 hour. Targeted - we called it: “Sanity Checks”.
> 
> **What are you testing?**  
> Importantly:
> 
> - Whats being release by looking at the release notes.
> - Any bugs previously reported.
> 
> **– Stories that were implemented?** - YES (Usually in read-only fashion).  
> **– Critical workflows** - YES. (Usually read-only).
> 
> **How often does it happen?** Depend on the Agile model thats being used. i-e: for us its every 2 weeks.
> 
> **Is it a distraction to ongoing work?**  
> Not at all, as we have a dedicated team. If eg: there is no dedicated team, we can arrange a rota.
> 
> **How do you measure success?**  
> When the items that are being released are working as expected and no regression has been caused. Even if there are issues: Depending upon their priority - are shared as “Known Issues” unless they are blocker they needs to be raise as High Priority and HotFix deployment gets created.

Happy to assist further if needed. 🙂